Step 4d – Finishing the Septic Install
After inspection, finish building your own septic system by installing inspection ports and covering the drain field.
After inspection, finish building your own septic system by installing inspection ports and covering the drain field.
Building your own septic system begins with excavating for the tank and drain field and assembling the drain lines.
In many places, you can’t get a permit to start building your own home without a septic design. Here’s how I got started on it.
The first step in building your own home after purchasing land is to begin connecting utilities that you will be using as you build.