Most builders have the cabinets installed first if they are using laminate flooring, but I decided not to. The reasons for installing cabinets first are to save costs on flooring that you will never see or step foot on, and …

Step 28 – Install Cabinets Read more »

With the treads in place, it was time to attach the ballusters and railing. The ballusters are made from 2×2’s with small notches routed out of them so they lock in between the treads and ensure each of the treads …

Step 26b – Build the Railing Read more »