The top of the spiral staircase is finished off with a wooden newel and ballusters were placed all around the perimeter of the landing. Again, it is important to notch the ballusters so they lock into the landing, and also …

Step 26c – Complete Top Railing and Apply Clear Coat Read more »

With the treads in place, it was time to attach the ballusters and railing. The ballusters are made from 2×2’s with small notches routed out of them so they lock in between the treads and ensure each of the treads …

Step 26b – Build the Railing Read more »