The company I purchased the aluminum shingles from had 11 different instructional videos on youtube, so after watching them multiple times I had a really good grasp on how to install them.  It really is impressive how they all interlock …

Step 14 – Finish the Roof Read more »

The whole point of working on the plumbing first was to make it easier to install the shingles.  I will be using interlocking aluminum shingles due to their proven record of longevity and ability to stand up to the high …

Step 13b – Roof Vents and Pressure Test Read more »

Before the subfloor can be nailed onto the joists, small sections of 2×12 called “blocking” must be installed.  Together with the rim joists they ensure that the floor joists won’t roll onto their flat sides where they can easily bend.  …

Step 9a – Install Blocking and Plumbing Read more »

After a couple weeks of frustration, I was rewarded with my second passing inspection today, giving me a green light to pour the concrete slab that will complete the foundation.  I do have a few more steps to take before …

Step 7a – Pull Stakes and Forms, Insulate, and Reinspect Read more »