I installed a decent portion of the cold water supply way back before I poured the concrete slab.  The roxul I used to insulate the slab is plenty to ensure that there won’t be any freezing issues with the PEX, …

Step 15a – Install the Cold Water Supply Read more »

Once the DWV has been planned out, installing the plumbing is a relatively simple process that involves drilling holes in studs and joists, cutting the pipe to fit, and cementing the fittings to the pipe.  The key is to always …

Step 13a – Install the Plumbing Read more »

After spending the weekend spraying the new slab down every hour or so, it was finally time to get the walls up!  This process of “wet curing” concrete can add up to 50 percent more strength when done for 3-7 …

Step 8 – Frame the First Floor Read more »

One thing I realized I forgot to document was that I placed a cardboard box around the DWV pipe for the downstairs tub and filled it with gravel.  This will allow me to easily break the thin layer of concrete …

Step 7c – Pour the Slab Read more »

Capillary forces are very powerful.  Have you ever been to a redwood forest and wondered how water gets from the roots to the leaves at the very top of the tree?  The answer is capillary force, and surprisingly, it works …

Step 7b- Add Gravel, Vapor Barrier, and Rebar Read more »

After a couple weeks of frustration, I was rewarded with my second passing inspection today, giving me a green light to pour the concrete slab that will complete the foundation.  I do have a few more steps to take before …

Step 7a – Pull Stakes and Forms, Insulate, and Reinspect Read more »