With the house completely wrapped in a cozy layer of polyiso foam, I was now prepared to add the water resistant barrier.  The Tyvek WRB comes in a 9 foot roll, and should be stretched taut across the surface of …

Step 16a – Attach the WRB Read more »

The first part of building the roof frame is to “roll trusses”.  Although some old fashioned builders prefer to frame their roofs one piece of lumber at a time, when building solo it can be dangerous to handle large roof …

Step 11 – Install the Roof Frame Read more »

With all of the 1st floor walls complete, it was neat to be able to navigate the rooms and get an idea of the feel of the dimensions of the house.   Before moving on to the 2nd floor I needed …

Step 8c – Plumb and Line Read more »